I spent the weekend development free which was nice.
21 June 2010
PG programmed the letter box jig into the C&C machine and popped out an mdf jig. I have made a few changes with the help of JP who is the go to man when needing plans drawn up using auto cad.
22 June 2010
I caught up with JP today about the letterbox drawings. JP made the changes for the 1st letterbox drawings, together we worked on the 2nd designed letterbox drawings. This will allow the students to have the option of which styled letter box they would like to make, or maybe they can design their own. I gave the updated drawings to PG, he programmed the 2 letterbox designs to the C&C machine. PG came back with the jigs, I was very happy with the way they turned out. I will start the letterbox assembly processes tomorrow.
Stained and varnished the legs for the coffee table today will take pictures once they have dried.